top of page

NEWS
Search
Good news for norwegian railways
Good news for norwegian railways - Kopstad can be part of the sollution. Discussion article in Jarlsberg newspaper, 14.3.26: https://www.jarlsbergavis.no/et-lyspunkt-for-norsk-jernbane-kopstad-kan-bli-en-del-av-losningen/o/5-26-611588
Anne Marstein
Mar 16


The fullfillment is in full swing
The fulfillment is in full swing, this has been celebrated with cake.
Anne Marstein
Mar 13


Soon ready for construction plots at Kopstad
Backfilling of masses at Kopstad freight terminal is in full swing. We have divided the area into different zones depending on, among other things, ground conditions. Some areas depend on a couple of years of pre-loading before they are filled. The areas furthest south (see the picture with the area facing the railway) have good ground conditions and are immediately filled. Only the top layer remains. These areas will be completed in 2026. We have also received many sleepers
Anne Marstein
Feb 13
The facility will soon be ready
The facility will soon be ready for hundreds of jobs, but a "farm road" stands in the way. New article in the local newspaper "Gjengangeren" can be read here (only for subscribers).
Anne Marstein
Jan 28
The deposit at Kopstad is growing
Car number 60.000 has now been at Kopstad with masses. It was also celebrated with cake.
Anne Marstein
Aug 20, 2025
bottom of page
